{
  "url": "https://www.coloradoremodeling.company/faq/how-long-does-the-framing-phase-take-during-an-interior-remodel",
  "name": "How long does the framing phase take during an interior remodel?",
  "@type": "FAQPage",
  "@context": "https://schema.org",
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  },
  "mainEntity": [
    {
      "name": "How long does the framing phase take during an interior remodel?",
      "@type": "Question",
      "acceptedAnswer": {
        "text": "Framing for a typical residential remodel usually takes between two to five days, depending on the square footage and whether load-bearing walls are involved. A straightforward project, like framing a new basement bedroom or closet, can often be completed in one to two days. Larger projects, such as opening a main floor living area or framing a full basement with a bathroom, take longer because they require building soffits around ductwork and plumbing stacks. Abraham Becerra acts as on-site lead to keep framing on schedule before coordinating mechanical sub-trades.",
        "@type": "Answer",
        "description": "Interior remodel framing typically takes 2 to 5 days, depending on the room size, layout complexity, and whether structural beams are being installed."
      }
    }
  ],
  "description": "Interior remodel framing typically takes 2 to 5 days, depending on the room size, layout complexity, and whether structural beams are being installed."
}