  "name": "At what point during a bathroom or kitchen renovation is plumbing scheduled?",
  "@type": "FAQPage",
  "@context": "https://schema.org",
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  },
  "mainEntity": [
    {
      "name": "At what point during a bathroom or kitchen renovation is plumbing scheduled?",
      "@type": "Question",
      "acceptedAnswer": {
        "text": "Plumbing trade coordination happens in two primary phases: the rough-in phase and the trim-out phase. After initial demolition and framing are complete, the plumbing sub-trade runs drain lines, vents, and water lines inside the open wall cavities. Once rough-in inspections are satisfied, our crew proceeds with drywall, mudding, interior painting, and tile setting. After tile and cabinetry are finished, we bring the plumbing specialist back for final trim-out to install faucets, showerheads, sinks, and toilets. This staging ensures delicate finish fixtures are not scratched or exposed to dust during major carpentry and painting work.",
        "@type": "Answer",
        "description": "Plumbing rough-ins are scheduled immediately after framing while walls are open, and final fixture trim-out occurs after tile, cabinetry, and painting are completed."
      }
    }
  ],
  "description": "Plumbing rough-ins are scheduled immediately after framing while walls are open, and final fixture trim-out occurs after tile, cabinetry, and painting are compl"
}